Experience
Complete reciprocating compressor unit (RCU002) for the facility «ДКС at the switch
Год: 2016
Место размещения: MGL "Kazakhstan-China"
The panel of LVPM was manufactured in accordance with the design documentation 1601.0220.600, developed by
Год: 2016
Место размещения: MGL "Kazakhstan-China"
Control block of the gas pumping unit GPU
Год: 2016
Место размещения: MGL "Kazakhstan-China"
Год: 2016
Место размещения: CS "Beregovaya", Purovsky District, YNAO
Шесть комплектов энергоблоков газотурбинных ЭГЭС-12С "Урал" для подачи топливного газа к двигателю.
Год: 2016Место размещения: OGCF "Chayadinskaya"
Two GPU
Год: 2016
Место размещения: MGL "Kazakhstan-China"
Three reciprocating compressor units БК2 for gas compression in block-boxes, equipped with the systems of ventilation, lighting, heating, fire alarm and fire fighting.
Год: 2016
Место размещения: Kovykta gas condensate field, Irkutsk Oblast
Four GPU-16 for operation within boosting compressor shop Nr. 1, extended within the second stage of design CGTP Yuzhno-Russkoye oil-gas field.
Заказчик: "Nadymstroygazdobycha", LLC for "Severneftegazprom", OJSCГод: 2015
Место размещения: Yuzhno-Russkoye oil-gas field
Twelve reciprocating compressor units in individual shelters for associated gas compression for further injection into formation.
Заказчик: "Vostsibneftegaz", PJSCГод: 2015
Место размещения: Yurubcheno-Tokhomskoe field
Three ready-to-operate reciprocating compressor units on a frame in common shelter for associated gas compression with electric engine as a drive.
Заказчик: "Neftegorsky Gas Plant", CJSC ("OC "Rosneft", OJSC)Год: 2014
Место размещения: Neftegorsky Gas Plant, Samara Oblast
Two ready-to-operate reciprocating compressor units on a frame for dry stripped gas (DSG) compression with possible installation in a block-box or hangar.
Заказчик: "МРК-Engineering", LLC for "Otradnensky Gas Plant", CJSC ("OC "Rosneft", OJSC)Год: 2014
Место размещения: Otradnensky Gas Plant, Samara Oblast
Three ready-to-operate reciprocating compressor units on a frame for associated gas compression and for the stage of purification and drying, with possible installation in a block-box or hangar.
Год: 2014
Место размещения: Otradnensky Gas Plant, Samara Oblast
Three reciprocating compressor units drove from a steam turbine, as part of hydrogen production unit and intended for delivery of product hydrogen to the process of diesel fuel hydro-treatment.
Год: 2014
Место размещения: Angarsk, Irkutsk Oblast
The air-intake system is intended for cleaning of cycle air in gas turbines from dust, atmospheric precipitations, decrease of the noise level during the operation of the gas-turbine engine and formation of the air flow at the entrance to GTU.
One ready-to-operate reciprocating compressor unit on a frame for associated gas compression, with possible installation in a block-box or hangar.
Год: 2014
Место размещения: Ust-Kharampurskoe field, YNAO.
Пять ГПА-16 в индивидуальных укрытиях для газокомпрессорной станции высокого давления (3-я очередь) Ванкорской группы месторождений.
Заказчик: ЗАО "Ванкорнефть"Год: 2014
Место размещения: Ванкорское месторождение
Одна комплектная компрессорная установка полной заводской готовности в блок-боксе,оборудованном системами отопления, вентиляции, освещения, пожарной сигнализации и пожаротушения.
Заказчик: АО "Грасис" для нужд ООО "Газпром Добыча Иркутск"Год: 2013
Место размещения: Ковыктинское газоконденсатное месторождение, Иркутская обл.
Одна комплектная поршневая компрессорная установка в индивидуальном быстровозводимом укрытии, оборудованном системами отопления, вентиляции, пожарной сигнализации и пожаротушения.
Заказчик: "Актобе МунайГаз"Год: 2012
Место размещения: Казахстан
- 1
- 2