Specialists from the External Work Department of INGC carry out erection supervision of three 3.5 MW electrically driven GСUs with ET900V2 electric motor manufactured by Nidec ASI and 2BCL457 compressor manufactured by Baker Hughes (Nuovo Pignone) previously manufactured at the company’s factory for the “Stagewise Reconstruction of Gas Compressor Station at Povkhovskoye Field” project in Khanty-Mansiysk Autonomous District of the Tyumen Region, LUKOIL Western Siberia LLC, Povkhneftegaz Territorial Production Company.
One unit is ready to be transferred for commissioning and two more units are at the initial stage of installation; the units are being installed on the foundation.