The project for manufacturing and delivery of two GPA-16 Irtysh units for the needs of ROSPAN INTERNATIONAL JSC with their subsequent delivery to the booster compressor station (ДКС-3) of Novy Urengoy linear department is in the design documentation (DD) development stage.
The units will be manufactured in accordance with the Customer’s technical assignment and requirements based on the main components of domestic manufacture: NTs-16DKS-05 centrifugal compressor (manufactured by Iskra NPO PJSC) and GTU-16P drive (manufactured by UEC-Perm Engines LLC).