In October 2023, under the contractual obligations and within the established deadlines, INGC started manufacturing six process units from the Low-Temperature Gas Condensation Unit ordered by Gazserf LLC with their subsequent delivery and commissioning at Ust-Purpeisky license area of Prisklonovoye field (the Yamal-Nenets Autonomous District).
The unit is block-modular systems (open blocks). Each Block houses equipment with piping, thermal insulation and electric heating; it is designed for separation of condensate and gas phase at low temperatures. INGC’s scope of supply includes Gas-Gas Exchanger Unit; Gas-Liquid Exchanger Unit; Evaporator Unit E-304; Valve Units, etc.