“Manufacturing and Delivery of Two GPA-8MW Units for Bovanenkovskoye Field” is in the active stage of manufacture for the needs of Gazpromneft-Zapolyarye LLC.
Both units will be manufactured with NK-14ST gas-turbine engine drive of 8MW power (manufactured by UEC-Kuznetsov JSC) and NTs-8DKS centrifugal compressor (manufactured by Iskra NPO PJSC). Manufacturing of air heating units, support systems, drive units, exhaust and lube oil supply systems has been completed. The centrifugal compressor unit and control unit are being manufactured.